Removable Soil Nailing
Temporary soil nail system designed for deep urban excavation, allowing 100% manual extraction after earth-retaining service life.
Overview
Product Overview
The SAMJ Removable Soil Nailing system is an innovative temporary earth-retaining reinforcement method. In urban excavations where permanent nails cannot be left in the ground due to adjacent property boundaries or subway tunnels, this method enables complete manual extraction of rebar nails upon completion of construction.
It provides full structural retaining capacity during excavation while eliminating underground encroachment liabilities through easy subsequent removal.
Key Features
- Manual Removal: Steel nail bars are extracted manually without requiring heavy pulling equipment, significantly saving labor and machinery costs.
- Pre-Assembled Quality: Delivered to the site fully assembled under rigorous factory quality control, ensuring rapid placement.
- Rigid Load-Bearing Body: High-strength ductile iron body withstands heavy insertion impacts without premature detachment.
- Reliable Release: Disengages cleanly from the threaded anchor body via simple rotation for smooth withdrawal.
Application Fields
Applied to deep urban excavations, temporary basement retaining walls, and civil projects adjacent to property borders.
Specifications & Structure
Product Structure
Full assembly breakdown of the SAMJ Removable Soil Nailing System.
Removable Soil Nailing Assembly Structure & ComponentsComponent Materials
Removable Nailing Bar, Spacer (CT), Flat Screw Body, Load-Bearing Body| Component | Specification & Grade |
|---|---|
| Removable Nailing Bar | D25 / D29 High-Strength Deformed Rebar (SD400) |
| Spacer | CT Centralizer Spacer |
| Threaded Segment | Precision Flat Body Screw |
| Load-Bearing Body | High-Strength Ductile Iron GCD450 |
| Accessories | Lock Nut, Bearing Plate, Waterproof Ring Nut, P.E Protection Tube, Grout Seal Tube |
Technical Information
Extraction Sequence
Once the retaining wall's temporary service life expires, the nail bar is released and extracted manually.
- Nut & Plate Disassembly: Unfasten the surface lock nut and remove bearing plate.
- Counterclockwise Rotation: Engage the removal socket and rotate the bar counterclockwise to disengage threads.
- Segment Separation: Push forward slightly to clear the spacer-locking segment from the load-bearing body.
- Manual Withdrawal: Pull the deformed rebar bar completely out of the borehole by hand.
Extraction Order: Nut Release → Counterclockwise Disengagement → Segment Release → Manual PulloutJob-Site Installation Steps
- On-site delivery of pre-assembled removable nail units.
- Drilling borehole and inserting the nail assembly.
- Installing wire mesh, bearing plate, and lock nuts.
- Applying shotcrete and pressurizing cement grout.
Removable Soil Nailing Field Application ExampleTrack Records
Explore track records and global project achievements.
Inquiry for Removable Soil Nailing
Please share your project conditions and required quantities. Our engineering team will review and reply promptly.