Sub-Wall System

Sub-Wall System

Removable Soil Nailing
Removable Soil Nailing

Removable Soil Nailing

Temporary soil nail system designed for deep urban excavation, allowing 100% manual extraction after earth-retaining service life.

Overview

Product Overview

The SAMJ Removable Soil Nailing system is an innovative temporary earth-retaining reinforcement method. In urban excavations where permanent nails cannot be left in the ground due to adjacent property boundaries or subway tunnels, this method enables complete manual extraction of rebar nails upon completion of construction.

It provides full structural retaining capacity during excavation while eliminating underground encroachment liabilities through easy subsequent removal.

Key Features

  • Manual Removal: Steel nail bars are extracted manually without requiring heavy pulling equipment, significantly saving labor and machinery costs.
  • Pre-Assembled Quality: Delivered to the site fully assembled under rigorous factory quality control, ensuring rapid placement.
  • Rigid Load-Bearing Body: High-strength ductile iron body withstands heavy insertion impacts without premature detachment.
  • Reliable Release: Disengages cleanly from the threaded anchor body via simple rotation for smooth withdrawal.

Application Fields

Applied to deep urban excavations, temporary basement retaining walls, and civil projects adjacent to property borders.

Specifications & Structure

Product Structure

Full assembly breakdown of the SAMJ Removable Soil Nailing System.

Removable Soil Nailing Assembly Structure & ComponentsRemovable Soil Nailing Assembly Structure & Components

Component Materials

Removable Nailing Bar, Spacer (CT), Flat Screw Body, Load-Bearing BodyRemovable Nailing Bar, Spacer (CT), Flat Screw Body, Load-Bearing Body
ComponentSpecification & Grade
Removable Nailing BarD25 / D29 High-Strength Deformed Rebar (SD400)
SpacerCT Centralizer Spacer
Threaded SegmentPrecision Flat Body Screw
Load-Bearing BodyHigh-Strength Ductile Iron GCD450
AccessoriesLock Nut, Bearing Plate, Waterproof Ring Nut, P.E Protection Tube, Grout Seal Tube

Technical Information

Extraction Sequence

Once the retaining wall's temporary service life expires, the nail bar is released and extracted manually.

  1. Nut & Plate Disassembly: Unfasten the surface lock nut and remove bearing plate.
  2. Counterclockwise Rotation: Engage the removal socket and rotate the bar counterclockwise to disengage threads.
  3. Segment Separation: Push forward slightly to clear the spacer-locking segment from the load-bearing body.
  4. Manual Withdrawal: Pull the deformed rebar bar completely out of the borehole by hand.
Extraction Order: Nut Release → Counterclockwise Disengagement → Segment Release → Manual PulloutExtraction Order: Nut Release → Counterclockwise Disengagement → Segment Release → Manual Pullout

Job-Site Installation Steps

  1. On-site delivery of pre-assembled removable nail units.
  2. Drilling borehole and inserting the nail assembly.
  3. Installing wire mesh, bearing plate, and lock nuts.
  4. Applying shotcrete and pressurizing cement grout.
Removable Soil Nailing Field Application ExampleRemovable Soil Nailing Field Application Example

Track Records

Explore track records and global project achievements.

View All Records

Inquiry for Removable Soil Nailing

Please share your project conditions and required quantities. Our engineering team will review and reply promptly.

Technical Inquiry
Removable Soil Nailing
SAMJIN STEEL Samjin Steel Industry Corporate Video