CT-Rock Bolt
Hybrid rock bolt combining tip-fixed rock shell and combination tube for immediate anchoring and dense mortar grouting.
Overview
Product Overview
The CT-Rock Bolt is a high-performance hybrid rock bolt that simultaneously utilizes tip-fixing and full-surface bonding mechanisms. An expandable rock shell provides immediate mechanical anchorage in the borehole until the injected mortar cures, while a dedicated combination tube ensures dense, void-free mortar filling.
The combination tube consists of an inner steel tube and an outer P.E tube. Mortar is injected from the deepest point of the borehole outward, allowing operators to visually confirm complete grouting via the return flow.
Key Features
- Immediate Crown Support: In tunnel crowns, the rock shell immediately fixes the bolt prior to mortar curing, preventing displacement and enabling safe drilling operations.
- Centering & Spacing: In tunnel sidewalls and slopes, the rock shell acts as a built-in centralizer to prevent bolt eccentricity.
- High-Pressure Grout Infiltration: Pressurized mortar penetrates surrounding rock joints and fissures, significantly reinforcing rock mass shear strength.
- Corrosion Protection Barrier: The combination tube prevents direct contact between ground water, corrosive air, and the structural steel rebar.
- Visual Grout Verification: Return flow exiting between the P.E tube and borehole collar enables visual verification of complete mortar filling.
Application Fields
Essential for tunnel crown and sidewall support, underground caverns, portals, and fractured rock slope stabilization.
Specifications & Structure
Product Structure
Structural overview of the CT-Rock Bolt system and tip-fixing expandable rock shell.
CT-Rock Bolt Structure and Tip-Fixed Rock Shell ComponentsComponent Functions
| No. | Component | Function & Engineering Role |
|---|---|---|
| 1 | Mortar Injection Port | Dedicated inlet for high-pressure cement mortar pumping. |
| 2 | High-Strength Deformed Rebar | Core tensile reinforcement member anchoring the rock mass. |
| 3 | Hexagonal Nut | Fastens spherical washer plate and steel dome tube under pre-tension. |
| 4 | Hemispherical Plate | Increases contact area against irregular rock faces and allows grout inspection. |
| 5 | Steel Dome | Supports injection port plate and maintains alignment during pressurization. |
| 6 | P.E Tube | Provides air exhaust channel, mortar return path, and anti-corrosion barrier. |
| 7 | Tip-Fixed Rock Shell | Expands radially to anchor bolt tip and guides smooth borehole insertion. |
Technical Information
Installation Sequence
- Borehole Insertion: Insert the CT-Rock Bolt with pre-assembled shell and washer into the drilled hole.
- Tip Anchorage: Rotate the tightening nut to expand the rock shell firmly against the rock borehole wall.
- Mortar Injection: Pump cement mortar through the combination tube from the borehole bottom outward.
- Grout Completion Check: Visually inspect return mortar flow emerging from the block washer relief port.
CT-Rock Bolt Installation: Insertion → Tip Fixing → Mortar Injection → Visual VerificationGrout Quality Assurance
The return mortar verification system facilitates dense, full-length cement bonding without internal air voids, supporting design pullout load resistance in permanent underground installations.
Track Records
Explore track records for Rock Bolt products.
Inquiry for CT-Rock Bolt
Please share your project conditions and required quantities. Our engineering team will review and reply promptly.